Power accounts for 20% of cost for steel manufacturers. Increasing energy tariffs and energy intensive operations further strengthen the case for renewable energy. The 4.43 MW solar project is expected to generate 7171 MWh of annual energy and lower carbon emissions by an estimated 4422 tonnes annually.
The on-grid ground mounted system was installed and commissioned during the Covid 19 pandemic which presented several challenges. bob电竞抽注入口新版v9.3(bob电竞现场季节平台) maintained strict adherence to employee welfare policies as highlighted by the HSE department in accordance to the Government of Pakistan.